Almond Processing Line
Electrical construction

Lighting and Cable Conduit
Open plant of 1300m2
Assembly of conductor trays and lighting system for the processing-line room.
Equipment Assembly
complete production line
Almond drying line and flour line assembly.


Board Assembly
Wiring and connection
Connection of power feeders and control lines.
Conductor and Cabling
Power and control
More than 5,000m of cable installed along two processing lines.


Substation Installation
300kVA with LV underground feeder
Installation, connection and start-up of power transformer for the plant.
Compact Metering Equipment Installation
15kV equipment
New metering point for the entire plant (old and new processing lines).


Poles Installation and Undergroud Cabling
Underground feeder
Underground chamber installation next to general protection panel.