top of page

Almond Processing Line

Electrical construction

IMG-20191220-WA0011.jpg

Lighting and Cable Conduit 

Open plant of 1300m2

Assembly of conductor trays and lighting system for the processing-line room.

Equipment Assembly

complete production line

Almond drying line and flour line assembly.

IMG_20200709_174533.jpg
IMG_20200612_095915.jpg

Board Assembly

Wiring and connection 

Connection of power feeders and control lines.

Conductor and Cabling

Power and control

More than 5,000m of cable installed along two processing lines.

IMG_20200516_104238.jpg
20200201_111331.jpg

Substation Installation

300kVA with LV underground feeder

Installation, connection and start-up of power transformer for the plant.

Compact Metering Equipment Installation

15kV equipment

New metering point for the entire plant (old and new processing lines).

IMG_20200725_124547.jpg
IMG_20200725_133434.jpg

Poles Installation and Undergroud Cabling

Underground feeder

Underground chamber installation next to general protection panel.