Construction of a MV Power Line 

For a 3MW solar power plant

IMG-20211119-WA0028.jpg

Pole Installation

measuring heading and verticality

Pole installation observing inclination and heading guidelines to obtain the predefined design measurements.

Underground Lines

Two underground connections were required

The connection to PCS and a line corossing requiered underground connections. These required cable splices, wich were performed in a wind shelter to ensure a clean installation.

IMG-20211123-WA0072.jpg
IMG-20211202-WA0058.jpg

Team Coordination

Safety and procedures 

The team met regularly to review safety measures and installation procedures to comply with the engineering guidelines and code requirements.

Line Crossing

66kV line undercrossing

A guard line was used complying with the local distribution network standard.

IMG_20211203_150902.jpg
IMG_20211211_124448.jpg

Cable Tensioning

Following engineering temperature tables

Cable tensioning was performed measuring the cable temperature and refering that to the calbe tensionong tables specified in the engineering proceedings. These tensions were calculated to ensure safety margin levels and pole solicitation within the allowed limits.

Reconnector and Metering at the Connection Point

With aux transformes and communications

The connection point system considered protections, Metering system, aux transformer and comunications.

IMG-20211207-WA0074.jpg
PXL_20221107_154255902.MP.jpg

Cable Tensioning

Following engineering temperature tables

Cable tensioning was performed measuring the cable temperature and refering that to the calbe tensionong tables specified in the engineering proceedings. These tensions were calculated to ensure safety margin levels and pole solicitation within the allowed limits.

Reconnector and Metering at the Connection Point

With aux transformes and communications

The connection point system considered protections, Metering system, aux transformer and comunications.