Parental Seed Processing Lines
Electrical construction
Load Control Center
1.6MW of managed power
Assembly, connections and start-up of the complete room, with individual feeders of up to 250m and up to 6 lines per phase.
Dry transformer
1.6MW
Installation, connection, testing and commissioning of the transformer.
LV feeders
More than 5,000m of power cable
Assembly of conductor carriers and layout of feeders throughout a 4,000m2 plant.
Conductor and Cabling
power and control
More than 20,000m of cable installed and more than 300 feeders connected along two processing lines.
MV feeders
600m of underground MV feeder
Installation, MV cable splices and commissioning tests (VLF) of 15kV MV cable.
Committed and Motivated Team
30 persons
Engineers, electrical constructors, welders, risk management specialist, administration and project management staff.
MV equipment
Switch room and individual switchgear
Installation, MV cable splices, commissioning and tests.